Job Cost Detail Report
The Job Cost Detail report allows you to capture costs and quantities of items used on Construction jobs.
The report will provide the Estimated and Actual amounts – for both cost and quantities for comparison.
It can be run for a single Job, or Jobs over a specified date range.
When determining totals, they can be Grouped in different ways. The grouping options provide totals for each grouping level, and this report can have up to five levels (not all are required).
For example, it is possible to get totals for a specific Account and then Jobs and Work Areas within each of those Jobs.
Information about the standard report usage can be found here.